The construction of this new, 7-story, steel and concrete apartment building began with the demolition of the 3 buildings that were previously on the site. The 45,000 sf building stretches across to the property lines which posed some unique challenges. The project produced 33 rental units of varying layouts and an 18 car garage with car elevator access to its basement location.